Perimeter Fire Containment

Curtain-wall edge-of-slab fire containment using assembly-specific safing, smoke seal and spandrel coordination.

Technical scope

Control the slab-edge and façade path between floors.

Perimeter fire containment addresses the void between a rated floor slab and the exterior curtain wall or façade. A failure here can permit vertical fire and smoke spread between storeys.

Façade geometry, mullions, spandrel construction, safing insulation, smoke seals and movement vary. The installed route must correspond to the actual tested or assessed assembly.

InterfaceFaçade-specific
MovementAllowed
ContinuityFloor-to-floor
01 / Buyer outcome

What this route should produce

  • Early façade/PFP interface coordination
  • Defined slab-edge system and sequence
  • Movement-compatible installation
  • Inspectable perimeter records
02 / Required inputs

What we need to qualify it

  • Façade shop drawings
  • Slab-edge dimensions
  • Curtain-wall construction
  • Required rating
  • Movement requirement
  • Access and closure sequence
01 / Scope

What the route can cover

  • Edge-of-slab safing
  • Curtain-wall interfaces
  • Smoke seal and top seal
  • Spandrel-zone coordination
  • Mullion and transom interfaces
  • Inspection and photographic records
02 / Delivery route

How work moves forward

  1. Review façade and slab-edge geometry
  2. Confirm tested system and movement
  3. Coordinate access and installation sequence
  4. Install safing and smoke seal
  5. Inspect continuity and close records
03 / Evidence expected

What buyers should expect

  • Assembly-specific evidence
  • Material and density records
  • Interface photographs
  • Inspection and repair status

Commercial and technical guardrails

What this route refuses to hide.

Fast progress is valuable only when assumptions, responsibility and limitations remain visible to the buyer and delivery team.

  • 01No generic mineral-wool stuffing
  • 02No omitted mullion detail
  • 03No compressed-safing guesswork
  • 04No façade closure before inspection