01 / KSA

الحماية السلبية من الحريق

تقدم Vortexen خدمة الحماية السلبية من الحريق للمشاريع في Saudi Arabia من خلال نطاق محدد وأدلة فنية ومسؤولية واضحة. يتم تأكيد النظام والاعتماد وجهة التنفيذ لكل مشروع قبل الالتزام.

النطاق الفني

Saudi Building Code and Civil Defence aligned passive fire protection.

Vortexen delivers passive fire protection across the Kingdom of Saudi Arabia, engineered to meet the requirements of the Saudi Building Code (SBC 801 Fire Protection) and project-specific Civil Defence directives.

We enforce strict separation between company commercial registration, material testing listings, installer qualification, and project-specific inspection acceptance.

Execution covers giga-project developments, industrial cities (MODON), petrochemical complexes in Jubail and Yanbu, and infrastructure projects across the Riyadh, Eastern, and Western provinces.

Saudi Arabia Compliance & Authority Pathway:Engineered in accordance with Saudi Building Code (SBC 801) and Saudi Civil Defence (Salamah) project submittal requirements.
SurveyCondition-led
EvidenceSystem-specific
HandoverTraceable
01 / Buyer outcome

What this route should produce

  • A defined PFP scope with exclusions
  • System-led material and installation route
  • Visible inspection and rectification status
  • A usable handover and evidence pack
02 / البيانات المطلوبة

What we need to qualify it

  • Project location and end user
  • Drawings, BOQ and specification
  • Required fire rating
  • Wall, floor or steel details
  • Penetrant and opening schedule
  • Programme and inspection deadline
01 / Scope

What the route can cover

  • MEP penetration firestopping
  • Movement and head-of-wall joints
  • Curtain-wall perimeter and façade cavity barriers
  • Intumescent steel fireproofing
  • Cementitious fireproofing
  • Fire-rated boards and enclosures
  • Thermal-insulation and acoustic-sealing interfaces
  • Industrial floor-coating and EIFS interface coordination
  • Opening schedules, tagging and close-out dossiers
02 / مسار التنفيذ

How work moves forward

  1. Review drawings, BOQ, specifications and actual interfaces
  2. Map each condition to suitable system evidence and approval path
  3. Submit materials, method, programme and inspection controls
  4. Execute with controlled materials and trained teams
  5. Inspect, rectify, tag and compile close-out records
03 / الأدلة المطلوبة

What buyers should expect

  • Project-specific system references
  • Material and batch traceability
  • Installer and inspection records
  • Before-and-after photographs
  • Verified credential scope only

Commercial and technical guardrails

What this route refuses to hide.

Fast progress is valuable only when assumptions, responsibility and limitations remain visible to the buyer and delivery team.

  • 01No one-product-fits-all substitution
  • 02No credential applied beyond its documented entity and scope
  • 03No concealed variation to tested configuration
  • 04No handover without location-level records

أرسل النطاق والمخططات وموعد القرار.

أرسل متطلبات المشروع ↗
Send requirementChoose one secure route