Technical scope
- Intumescent coating systems
- Cementitious and SFRM systems
- Fire-rated board encasement
- Primer and topcoat coordination
- Repair and reinstatement
- Thickness, adhesion and density controls
01B / UAE
Project-specified intumescent, cementitious and board fireproofing routes with substrate, thickness and QA/QC controls.
Technical scope
Structural fireproofing delays temperature rise so critical elements can maintain the required performance during fire exposure. The material family and thickness depend on the approved design basis and actual section.
Vortexen coordinates surface condition, primer compatibility, environmental limits, application thickness, reinforcement where required, repair and final inspection records.