01

Confirm applicability before changing design

Publication date, project stage, jurisdiction, transitional provisions and authority direction determine how a new code edition affects a live project.

02

Run a clause-to-asset gap review

Compare affected fire strategy, systems, materials, testing, documentation and maintenance requirements against approved and installed conditions.

03

Control every resulting change

Record technical owner, authority clarification, drawing revision, procurement impact, site variation, inspection requirement and close-out evidence.

Project-specific verification

Codes, approvals, credentials, system evidence and authority requirements change. Confirm the current legal entity, scope, project specification and acceptance route before procurement or installation.