Confirm applicability before changing design
Publication date, project stage, jurisdiction, transitional provisions and authority direction determine how a new code edition affects a live project.
Run a clause-to-asset gap review
Compare affected fire strategy, systems, materials, testing, documentation and maintenance requirements against approved and installed conditions.
Control every resulting change
Record technical owner, authority clarification, drawing revision, procurement impact, site variation, inspection requirement and close-out evidence.