01

Use exact approval language

A product certificate, system test, contractor credential and project approval are not the same. Each document should be checked for entity, scope, validity and conditions.

02

Translate design into an application schedule

Steel section factor, fire period, critical temperature, primer, environment and finish determine the required build-up for each member or member group.

03

Protect the inspection route

Surface condition, environment, batch, wet or dry thickness, reinforcement, repairs and final acceptance need planned hold points before work is concealed or access changes.

Project-specific verification

Codes, approvals, credentials, system evidence and authority requirements change. Confirm the current legal entity, scope, project specification and acceptance route before procurement or installation.