01

Jurisdiction changes the route

Dubai and Abu Dhabi projects operate through different authorities, systems, licensed activities and review processes. The exact project location and use should be confirmed at the start.

02

Approval types are not interchangeable

Company licensing, product listing, system approval, design approval, contractor qualification, inspection and final completion are separate gates.

03

Build an approval responsibility matrix

Assign every drawing, calculation, submittal, inspection and authority interaction to the authorized party, with required inputs and target dates.

Project-specific verification

Codes, approvals, credentials, system evidence and authority requirements change. Confirm the current legal entity, scope, project specification and acceptance route before procurement or installation.