01

Confirm the system and exposure

Epoxy intumescent selection should follow the project fire scenario, durability requirement, substrate, primer, mesh or reinforcement, topcoat and environmental exposure.

02

Check application capability

Equipment capacity, trained applicators, material conditioning, mixing, spray control, access and repair method affect consistency across complex steelwork.

03

Demand measurable records

Batch, climate, surface preparation, primer, wet film, dry thickness, reinforcement, defects, adhesion where specified and final coating status belong in the dossier.

Project-specific verification

Codes, approvals, credentials, system evidence and authority requirements change. Confirm the current legal entity, scope, project specification and acceptance route before procurement or installation.