Passive Fire Protection

Survey, design coordination, firestopping, structural fireproofing, QA/QC and traceable handover for demanding construction and industrial environments.

Technical scope

Saudi Building Code and Civil Defence aligned passive fire protection.

Vortexen delivers passive fire protection across the Kingdom of Saudi Arabia, engineered to meet the requirements of the Saudi Building Code (SBC 801 Fire Protection) and project-specific Civil Defence directives.

We enforce strict separation between company commercial registration, material testing listings, installer qualification, and project-specific inspection acceptance.

Execution covers giga-project developments, industrial cities (MODON), petrochemical complexes in Jubail and Yanbu, and infrastructure projects across the Riyadh, Eastern, and Western provinces.

Saudi Arabia Compliance & Authority Pathway:Engineered in accordance with Saudi Building Code (SBC 801) and Saudi Civil Defence (Salamah) project submittal requirements.
SurveyCondition-led
EvidenceSystem-specific
HandoverTraceable
01 / Buyer outcome

What this route should produce

  • A defined PFP scope with exclusions
  • System-led material and installation route
  • Visible inspection and rectification status
  • A usable handover and evidence pack
02 / Required inputs

What we need to qualify it

  • Project location and end user
  • Drawings, BOQ and specification
  • Required fire rating
  • Wall, floor or steel details
  • Penetrant and opening schedule
  • Programme and inspection deadline
01 / Scope

What the route can cover

  • MEP penetration firestopping
  • Movement and head-of-wall joints
  • Curtain-wall perimeter and façade cavity barriers
  • Intumescent steel fireproofing
  • Cementitious fireproofing
  • Fire-rated boards and enclosures
  • Thermal-insulation and acoustic-sealing interfaces
  • Industrial floor-coating and EIFS interface coordination
  • Opening schedules, tagging and close-out dossiers
02 / Delivery route

How work moves forward

  1. Review drawings, BOQ, specifications and actual interfaces
  2. Map each condition to suitable system evidence and approval path
  3. Submit materials, method, programme and inspection controls
  4. Execute with controlled materials and trained teams
  5. Inspect, rectify, tag and compile close-out records
03 / Evidence expected

What buyers should expect

  • Project-specific system references
  • Material and batch traceability
  • Installer and inspection records
  • Before-and-after photographs
  • Verified credential scope only

Commercial and technical guardrails

What this route refuses to hide.

Fast progress is valuable only when assumptions, responsibility and limitations remain visible to the buyer and delivery team.

  • 01No one-product-fits-all substitution
  • 02No credential applied beyond its documented entity and scope
  • 03No concealed variation to tested configuration
  • 04No handover without location-level records